DESCRIPTION OF WORK:


FOUNDATION AND BASEMENT:- 

Earth work excavation 4’0” x 4’0” x6’0” (upto Hard Surface) PCC & mud filling

Bed concrete 9” tk. Tapper Concrete 1’(Trapezoidal footing)

Footing mate 10mm dia in both ways 150mm c/c.

Plinth beam 2/3nos 12mm dia & bottom 2/3nos 12 mm dia @ top. (as Per Structural Drawings)

REINFORCEMENT CEMENT CONCRETE:- (as Per Structural Drawings)

Column size 1’-0” x 0’-9” & 0’-9” x 0’-9” (R.C.C. 1:1.5:3 concrete ratio)

Steel size, 12mm -4/6nos with 8mm rings @ 7” c/c

Lintel (2nos 10mm dia & bottom 2nos 10mm dia @ top 8mm dia stirrups @ 6” c/c R.C.C 1:1.5:3 concrete ratio

Roof beam (3nos 12mm dia @ bottom 3nos 12mm dia @ top 8mm dia stirrups @ 7” c/c 

Roof slab 10mm main rod & 8mm distributor @ 6” c/c (R.C.C.  1:1.5:3 concrete ratio, Slab thickness 4" – 6” tk)

BRICK WORK:-

Basement wall brick work 9” tk using Flyash Bricks above plinth beam to basement level to 3’ height.

Super structure Brick work wall in c.m. 1:6 using Country wood bricks walls thickness 0’- 9” & 0’ – 4.5” tk height 10’ for each floor

PLASTERING WORK:-

Ceiling plastering with c.m 1:3 

Inner Wall plastering with c.m 1:4 

Out wall plastering with c.m 1:4

WALL CUPBOARD:-

Bed room cupboard – 1no (size 7’ 0” height, 3’-0” breadth, 1’-6” depth, side wall in bricks & Kadapa slab)

Kitchen Top Granite Slab & SS sink 24" x 18" (side wall glazed tiles height 2'0")

Each Bedroom & Kitchen with single side Loft.

DOORS, WINDOW & VENTILATOR:-

Main door- Teak Wood Door and Frame (No Attached window and frame), size 7' x 3'0"

Bedroom, Kitchen - Designer Readymade Doors with Teakwood Frame.

Windows using UPVC Windows with MS Grill Rod with Standard patterns

Bathroom Door – Syntex PVC (Heavy Door) 

PARAPET WALL:-

For the proposed construction wall around parapet wall 0’-9” tk pillar 0’-4.5” tk partition, wall height 2’6” & both side plastering.

PAINTING WORK:-

Ceiling one coat Birla White cement and Two coat Emulsion White 

Wall Inside two coat Putty, One coat primer & Two Coat Color Paint 

Outside one coat Birla White cement & two coat Exterior paint

PLUMBING WORK:-

Supplying & fixing of CPVC pipe ¾” & P.V.C Pipe

Supply & fixing I.W.C White closet & E.W.C Wash Basin

Tank delivery to bath room, Kitchen, 1” P.V.C. Pipe open type, Overhead Tank 500 L Syntex

Drainage line 4” P.V.C. Pipe 4 gauge, 

Waste line 2 ½” P.V.C. Pipe 4 gauge,

Inspection Chamber 2’0” x 2’0” 1 no with R.C.C. manual cover

Rain water pipe 4” P.V.C. Pipe 4 gauge Kitchen SS Sink 24”x18”

FLOORING TILES:-

Flooring tiles 2’-0” x 2’-0” as per our tiles rate per sq.ft 50/-

Wall tiles 0’-12” x 0’-15” as per our tiles rate per sq.ft 35/- 

Kitchen top with Granite Platform & wall tiles 0’-12” x 0’-18” tiles height 2’-0”

Bath room wall tiles height 7’0”

Bath room tiles flooring 0’-10” x 0’-10” as per tiles rate per sq.ft 40/-

Staircase in tiles flooring with MS Handrails per tiles rate per sq.ft 40/-


FOLLOWING MATERIALS ARE USED FOR CONSTRUCTION:


S.No

Material

Brand

1
Cement and Steel
Dalmia / Chettinad / Ramco/ Maha and
GBR – Fe 500 and 550 Grade
2Outer Paint
Asian Exterior Paint / Brila paint
3Inner Paint & Putty
MYK Laticrete / Birla wall Putty / Asian Putty & Asian TractorShyne Emulsion Paint
4Sanitary Fittings
Parryware or Equivalent
5

Electrical & Plumbing

Finolex (FR) or Orbit ( FR ) wires, Roma Switches, & Ashirvad CPVC, Finolex PVC
6Bricks and Sand
Country wood  Red Bricks & Flyash Bricks(Basement only) and
Double water wash Polished M- Sand & P Sand
7Wood

Door - Teak Wood & Designer Readymade doors,

Bathroom - Syntex PVC (Heavy Door)

Window - UPVC

 


  • THE FOLLOWING WORKS ARE NOT INCLUDED IN OUR QUOTATION:

 

  • BUILDING PLAN APPROVAL
  • M.E.S. LINE CONNECTION (SINGLE OR THREE PHASE)
  • BORE WELL & MOTOR
  • OVER HEAD TANK (BRICK WORK)
  • ELECTRICAL FITTING (FAN, TUBELIGHT, EXHAUST FAN, ETC)
  • SUMP & SEPTIC TANK
  • COMPOUND WALL
  • ELEVATION CLADDING & TILING
  • STAIRCASE (If not included in built-up area)
  • WEATHERING TILES
  • PILE FOUNDATION